Suez Cannel Ismailia Tunnels
Stage 1 : Monitoring and testing the tunnel shafts
Customer Name :
Petrojet & Concord for Engineering & Contracting
Tasks :
-
supply and install inclinometer casing to monitoring the shaft walls inclination.
-
Do cross hole sonic test to shafts walls , for two shafts , each shaft include 32 walls with depth 60 meters , each wall include 4 sonic pipes.
The Ismailia road tunnel is a twin tube road tunnel that will cross the existing and new suez chanel north of the city of Ismailia