Supplying, Installing, Operating, And Training For Advanced Coating Complete Center Including Design And Installation Of Class 1000 Clean Room (PECVD)

Stage 1 : complete standalone LNAPL RECOVERY SYSTEMS

Customer Name :

Egyptian Refining Company (Erc)

Tasks :

  • Skimming system.

  • Solar controller.

  • Storage tank.

With the expansion and development of the Egyptian economy, the domestic demand for refined petroleum products, especially diesel, has increased. In addition, as more natural gas is utilized to meet Egypt’s expanding requirements for electricity, the demand for fuel oil decreases. The technology in most of Egypt’s refineries produces large amounts of fuel oil, but the growing demand is for lighter products such as diesel. The increased demand for lighter petroleum products is one of the most important challenges Egypt’s oil and gas industry faces.

More Projectes

Saudi Arabia

Installation and Follow up of systems for Task Execution Is Monitoring Tower For Detecting The Outside Effects On The Tower Like the Wind Speed And Wind Direction

Saudi Arabia

Makkah Soil Is Hard Rock. So, they use Blasting to Excavate for Foundation. During the Blasting Process, they need to monitor the Surrounded Building to Monitor Any Settlement

Kuwait

Supply complete monitoring solution for testing and monitoring the piles for strain stress along the piles and structure settlement

Sudan

The Task Executed is Installing Hydrological Monitoring Systems Full Complete to Monitoring the all Water Level , Water Quality Parameters , Water Speed

Egypt

Solar Cell: Amorphous Silicon Deposition Anti- Reflection and Anti-Scratch Layers: (Oxides, Nitrides, Oxynitrite, Carbides) Carbon Nanotube (CNT) Semiconductors: Low temperature thin film deposition on the semiconductors