Al-Berka Tunnel Short and Long-Term Web Base Structural Health Monitoring (SHM)

Stage 1 : Supply, install, operate web based (SHM)

Customer Name :

Saudi BinLadin Group

Tasks :

  • Tunnel deformation.

  • Blasting Monitoring.

  • Tunnel short- and monitoring Long-Term Vibration.

  • Water Leakage detector.

  • Crack Monitoring.

  • Settlement and tilting Monitoring.

Supply, install, operate web based structure health monitoring systems to Makkah first ring Road and Bus station project – Berakah & Kudai tunnels (MFRR).

More Projectes

Saudi Arabia

Installation and Follow up of systems for Task Execution Is Monitoring Tower For Detecting The Outside Effects On The Tower Like the Wind Speed And Wind Direction

Saudi Arabia

Makkah Soil Is Hard Rock. So, they use Blasting to Excavate for Foundation. During the Blasting Process, they need to monitor the Surrounded Building to Monitor Any Settlement

Kuwait

Supply complete monitoring solution for testing and monitoring the piles for strain stress along the piles and structure settlement

Sudan

The Task Executed is Installing Hydrological Monitoring Systems Full Complete to Monitoring the all Water Level , Water Quality Parameters , Water Speed

Egypt

Solar Cell: Amorphous Silicon Deposition Anti- Reflection and Anti-Scratch Layers: (Oxides, Nitrides, Oxynitrite, Carbides) Carbon Nanotube (CNT) Semiconductors: Low temperature thin film deposition on the semiconductors