CENTRAL BODY SHOP PROJECT
Stage 1 : Hydrological Monitoring System
Customer Name :
BEHBEHANI GROUP KUWAIT
Tasks :
-
The strain gauges are installed on selected 4 piles. Each pile has 12 sensors in three levels (4 gauges in each level).
-
The extensometers were installed on selected 4 boreholes. Each borehole has 3 sensors in three levels (25,15 and 8 meters’ depth), the extensometer is Rod extensometer system Electronic type.
-
Do pile integrity test to 420 pile 90cm Dia. And 30-meter depth.
-
Do pile Cross Hole Sonic Test to 75 piles, 4 access pipes per pile, pile Dia. 90 cm , pile length 30 meter.
-
Do pile load test to 10 piles pile Dia. 90 cm, pile length 30 meter.
Supply complete monitoring solution for testing and monitoring the piles for strain stress along the piles and structure settlement.