On Line On-Line Hydrological Monitoring Systems

Stage 1 : Hydrological Monitoring System

Customer Name :

Ministry of Electricity and Dams Merowe Dam Electricity CO.

Tasks :

  • Bed-Material Samplers.

  • Complete Cable Way System Current Meter with Cable Way System (Installed In the Two River Side's).

  • Propeller Current Meter.

  • Depth Integrating Sampler for Suspended Sediment.

  • Nile river profile using River-Ray ADCP.

  • Web Based Automatic Water Level Monitoring Radar.

  • Universal Current Meter.

  • Install 12 Piezometer Systems around the Merowe Dam for Water Level Monitoring, Water Analysis, and Water Sampling.

  • Complete trolley Crane with Winch and Current Meter.

  • Web Based Complete Water Quality Stations.

The Task Executed is Installing Hydrological Monitoring Systems Full Complete to Monitoring the all Water Level , Water Quality Parameters , Water Speed , Taking the Water Samples , river bid samples and Controlling the Discharging Water from the Merowe Dam and Monitoring the Discharging and Filling of Merowe Lake in Sudan , The Systems Installed Over the Dam and Before the Dam on the Small Rivers That Supply The Lake , Every Station Include the Sensors and Data Logging and Collection and GSM Station and Solar Cell for Power the Stations , and the Data is Sent From the Stations Automatically to the Web for Real Time Monitoring and for Archiving for Future Statistics , We Install the Systems in the Determined Locations , Take Initial Readings and Flow up The System From the Site and Remotely on line and Make the Analysis Remotely and Send Report to the Owner Daily With all the Readings of the Day .

More Projectes

Saudi Arabia

Installation and Follow up of systems for Task Execution Is Monitoring Tower For Detecting The Outside Effects On The Tower Like the Wind Speed And Wind Direction

Saudi Arabia

Makkah Soil Is Hard Rock. So, they use Blasting to Excavate for Foundation. During the Blasting Process, they need to monitor the Surrounded Building to Monitor Any Settlement

Kuwait

Supply complete monitoring solution for testing and monitoring the piles for strain stress along the piles and structure settlement

Sudan

The Task Executed is Installing Hydrological Monitoring Systems Full Complete to Monitoring the all Water Level , Water Quality Parameters , Water Speed

Egypt

Solar Cell: Amorphous Silicon Deposition Anti- Reflection and Anti-Scratch Layers: (Oxides, Nitrides, Oxynitrite, Carbides) Carbon Nanotube (CNT) Semiconductors: Low temperature thin film deposition on the semiconductors