Supply/ Provide technical support to all the instrumentation needed during construction phase including the instruments needed for monitoring

Stage 1

Customer Name :

Metro Authority.

Tasks :

  • Inclination in piles & concrete walls.

  • Strain – Stress in concrete walls structure.

  • Under ground water level monitoring devices (indicators & piezometers).

  • Pumping test monitoring devices.

UG is a sub-contractor of the main contractors (Orascom & Arab contractors) of the project.

More Projectes

Saudi Arabia

Installation and Follow up of systems for Task Execution Is Monitoring Tower For Detecting The Outside Effects On The Tower Like the Wind Speed And Wind Direction

Saudi Arabia

Makkah Soil Is Hard Rock. So, they use Blasting to Excavate for Foundation. During the Blasting Process, they need to monitor the Surrounded Building to Monitor Any Settlement

Kuwait

Supply complete monitoring solution for testing and monitoring the piles for strain stress along the piles and structure settlement

Sudan

The Task Executed is Installing Hydrological Monitoring Systems Full Complete to Monitoring the all Water Level , Water Quality Parameters , Water Speed

Egypt

Solar Cell: Amorphous Silicon Deposition Anti- Reflection and Anti-Scratch Layers: (Oxides, Nitrides, Oxynitrite, Carbides) Carbon Nanotube (CNT) Semiconductors: Low temperature thin film deposition on the semiconductors