Suez Cannel Ismailia Tunnels

Stage 1 : Monitoring and testing the tunnel shafts

Customer Name :

Petrojet & Concord for Engineering & Contracting

Tasks :

  • supply and install inclinometer casing to monitoring the shaft walls inclination.

  • Do cross hole sonic test to shafts walls , for two shafts , each shaft include 32 walls with depth 60 meters , each wall include 4 sonic pipes.

The Ismailia road tunnel is a twin tube road tunnel that will cross the existing and new suez chanel north of the city of Ismailia

More Projectes

Saudi Arabia

Installation and Follow up of systems for Task Execution Is Monitoring Tower For Detecting The Outside Effects On The Tower Like the Wind Speed And Wind Direction

Saudi Arabia

Makkah Soil Is Hard Rock. So, they use Blasting to Excavate for Foundation. During the Blasting Process, they need to monitor the Surrounded Building to Monitor Any Settlement

Kuwait

Supply complete monitoring solution for testing and monitoring the piles for strain stress along the piles and structure settlement

Sudan

The Task Executed is Installing Hydrological Monitoring Systems Full Complete to Monitoring the all Water Level , Water Quality Parameters , Water Speed

Egypt

Solar Cell: Amorphous Silicon Deposition Anti- Reflection and Anti-Scratch Layers: (Oxides, Nitrides, Oxynitrite, Carbides) Carbon Nanotube (CNT) Semiconductors: Low temperature thin film deposition on the semiconductors