CENTRAL BODY SHOP PROJECT

Stage 1 : Hydrological Monitoring System

Customer Name :

BEHBEHANI GROUP KUWAIT

Tasks :

  • The strain gauges are installed on selected 4 piles. Each pile has 12 sensors in three levels (4 gauges in each level).

  • The extensometers were installed on selected 4 boreholes. Each borehole has 3 sensors in three levels (25,15 and 8 meters’ depth), the extensometer is Rod extensometer system Electronic type.

  • Do pile integrity test to 420 pile 90cm Dia. And 30-meter depth.

  • Do pile Cross Hole Sonic Test to 75 piles, 4 access pipes per pile, pile Dia. 90 cm , pile length 30 meter.

  • Do pile load test to 10 piles pile Dia. 90 cm, pile length 30 meter.

Supply complete monitoring solution for testing and monitoring the piles for strain stress along the piles and structure settlement.

More Projectes

Saudi Arabia

Installation and Follow up of systems for Task Execution Is Monitoring Tower For Detecting The Outside Effects On The Tower Like the Wind Speed And Wind Direction

Saudi Arabia

Makkah Soil Is Hard Rock. So, they use Blasting to Excavate for Foundation. During the Blasting Process, they need to monitor the Surrounded Building to Monitor Any Settlement

Kuwait

Supply complete monitoring solution for testing and monitoring the piles for strain stress along the piles and structure settlement

Sudan

The Task Executed is Installing Hydrological Monitoring Systems Full Complete to Monitoring the all Water Level , Water Quality Parameters , Water Speed

Egypt

Solar Cell: Amorphous Silicon Deposition Anti- Reflection and Anti-Scratch Layers: (Oxides, Nitrides, Oxynitrite, Carbides) Carbon Nanotube (CNT) Semiconductors: Low temperature thin film deposition on the semiconductors