El Dabaa Nuclear Power Plant – Comprehensive Studies and Monitoring
- December 9, 2019
- Posted by: webadmin@unitedgroupco.com
- Category: Business plans
United Group successfully completed extensive hydro-geo-geotechnical studies and long-term groundwater monitoring for Egypt’s largest energy project — the El Dabaa Nuclear Power Plant.
The project required advanced analytical capabilities, precise field instrumentation, and a deep understanding of the site’s geological characteristics.
By integrating real-time data collection with continuous monitoring systems, United Group ensured the stability, safety, and environmental sustainability of the project’s foundation zones.
-
Advanced groundwater monitoring network installed.
-
Comprehensive data interpretation for foundation design and risk mitigation.
-
Collaboration with international consultants and local contractors.
Leave a Reply Cancel reply
Contact the nearest United Group office or submit your inquiry online for expert support and consultation.